Project Overview:
This three-year, three-stage project involved the complete redevelopment of an existing operational aged care facility with the construction of a new 2-storey building totaling 153 beds. Stage 1 required methodology creativity, staging and design considerations to ensure client operations were continually met.
Davies Electrical was contracted to Supply and Install all Electrical, Communications, CCTV and Security works including the following:
Temporary Power across the site
Staged Demolition of the existing facility and associated infrastructure
Temporary Power across the site back feeding to existing MSB
Site Main Switchboard including a power monitoring system
Multiple sub-mains and distribution boards throughout the installation
Provision of general and specialised lighting throughout the complex including car-park and public lighting
Power supplies to Mechanical, Fire, Hydraulic and specialized services
Monitored Exit and emergency evacuation lighting throughout the complex
Provision of a hearing augmentation system
Integrated voice and data including copper and optical fibre cabling
Electronic security / access control system
CCTV System / Intercom systems including interface to the DECT phone system
Provision of reticulated IP MATV system
Testing and Commissioning
As-built Manuals
Lighting Overview
Davies Electrical was involved with the Design and Installation of a complete C-Bus / DALI Lighting Control System throughout the entire complex including PE and Sensor Controls. The Exterior Lighting involved Civil Works (Trenching, Hole Boring and Footings), Conduit installation, Rag Cage Assembly and Light Pole Installation.